truck
≡
Menu
Home
Kategory
Page
Home
»
769D
»
769D Off-Highway Trucks. Suspension Cylinder (Front) - Purge and Charge
Wednesday, January 2, 2013
769D Off-Highway Trucks. Suspension Cylinder (Front) - Purge and Charge
8:41 PM
Perform Testing and Adjusting, "Visual Inspection" before you service the suspension cylinders.
The machine must be on level ground when you inspect the suspension cylinder charge. The truck body must be empty. Coast the machine to a gentle stop without using the brakes. Take note of the current ride height of the suspension cylinders. Look up the dimensions for the previous ride height of the suspension cylinders after the last nitrogen charging procedure. Compare the two values. The suspension height will be different for each machine.
When the front suspension cylinders are properly charged, the left front suspension cylinder will not show as much of the chrome as the right front suspension cylinder shows. This is due to the weight of the cab.
Note:
Both suspension cylinders must be charged at the same time. If only one suspension cylinder needs servicing, perform the procedure on both suspension cylinders.
Purge the Suspension Cylinder of Oil and of Nitrogen
Table 1
Tools Needed
Qty
9U-5617
Oil Refill Pump
1
WARNING: Personal injury or death can result from sudden suspension cylinder movement.
Sudden movement, up or down, can cause the clearance above your head to change rapidly.
Read all warning labels on the suspension cylinders before servicing. Do not check the oil in the suspension cylinder until all the nitrogen pressure has been released.
Do not, under any condition, remove valves, cover or plugs from the cylinder unless the rod is fully retracted and all the nitrogen pressure is released.
Do not stand under the machine when testing or adjusting the suspension cylinders.
NOTICE
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
(1) Valve cap(2) Charging valve
Remove valve caps (1) from the charging valves (2) that are located on each of the front suspension cylinders. Disconnect the charging hoses from the rest of the
9U-5617
Oil Refill Pump. Turn the check valves on the
7S-5106
Chucks counterclockwise in order to ensure that the charging valves will not open during installation. Install the charging hoses to charging valves (2) with the
7S-5106
Chucks. The charging hoses will be used to drain oil into an approved container.
Turn the check valves on the
7S-5106
Chucks clockwise. This opens up charging valves (2). This allows oil and nitrogen to flow through charging valves (2). When the suspension cylinders have bottomed completely, leave the check valves in position for five minutes in order to allow the pressure in the suspension cylinders to equalize.
After the pressure has equalized, turn the check valves on the
7S-5106
Chucks counterclockwise. This closes charging valves (2) .
Remove the charging hoses from charging valves (2). Attach the charging hoses to rest of the
9U-5617
Oil Refill Pump. Place the ends of the charging hoses into an approved container or into the filler tube of the
9U-5617
Oil Refill Pump. Cycle some oil in order to ensure that the charging hoses are full of clean oil. Attach the
7S-5106
Chucks to charging valves (2) .
Setting Up For Measurement
(3) Reference line
(4) Top edge of the axle(5) Reference line
Position a steel ruler or a thin strip of sheet metal on both of the suspension cylinders in order to measure the rod extension. A magnet can be used in order to mount the measuring tool. Possible magnets include the magnetic plug for the final drive and the magnetic base for a dial indicator. The measuring tool should extend downward. The measuring tool should be parallel to the centerline of the suspension cylinder.
Create reference line (3) on the steel ruler. Reference line (3) should line up with the top edge of the axle (4) .
Create reference line (5) in order to indicate the guideline for the oil charging procedure. Reference line (5) should be 25.4 mm (1.00 inch) below reference line (3) .
(6) FT1680 Gauge Block
One
FT1680
Gauge Block (6) is required for each suspension cylinder. These gauge blocks are required for correct service of the front suspension cylinders.
Measure the difference between the outside ambient temperature and the temperature of the service shop. If this temperature difference is greater than 11°C (20°F), you will also need to use shims. Add 3.2 mm (0.125 inch) of shims for each 5.5°C (10°F) of temperature difference.
Example
Note:
Estimate the temperature difference to the nearest 5.5°C (10°F).
Temperature of the service shop ... 10°C (50°F)
Outside ambient temperature ... −40°C (−40°F)
Difference in temperatures
10°C (50°F) − (−40°C (−40°F)) = 50°C (90°F)
Shim thickness:
50°C (90°F) × 3.2 mm (0.125 in) ÷ 5.5°C (10°F) = 29.1 mm (1.125 in)
Dimension for the nitrogen charging procedure
170.0 mm (6.69 in) + 29.1 mm (1.125 in) = 199.1 mm (7.81 in)
Oil Charging Procedure
Table 2
Tools Needed
Qty
9U-5617
Oil Refill Pump
1
WARNING:
Personal injury or death can result from sudden suspension cylinder movement.
Sudden movement, up or down, can cause the clearance above your head to change rapidly.
Read all warning labels on the suspension cylinders before servicing. Do not check the oil in the suspension cylinder until all the nitrogen pressure has been released.
Do not, under any condition, remove valves, cover or plugs from the cylinder unless the rod is fully retracted and all the nitrogen pressure is released.
Do not stand under the machine when testing or adjusting the suspension cylinders.
Note:
Use SAE 10W oil with the current service classification for the oil charging procedure.
The charging hoses and the
7S-5106
Chucks should be connected to charging valves (2). Open the shutoff valves. Adjust the air pressure on the regulator. The air pressure must not exceed 860 kPa (125 psi).
Turn the check valves on the
7S-5106
Chucks clockwise. This opens up charging valves (2) .
Inject the oil into the suspension cylinder until the top edge of the axle (4) lines up with reference line (5) .
Note:
If one suspension cylinder reaches reference line (5) before the other suspension cylinder, close the shutoff valve for that suspension cylinder. Continue injecting oil into the other suspension cylinder until the top edge of the axle (4) lines up with reference line (5) .
Close the shutoff valves. Turn off the air pressure at the regulator. Turn the check valves on the
7S-5106
Chuck counterclockwise. This closes charging valves (2) .
After the pressure has returned to zero, use the quick couplers to remove the charging hoses. If the quick couplers are not available, you may need to remove the
7S-5106
Chucks .
Nitrogen Charging Procedure
Table 3
Tools Needed
Qty
175-5507
Nitrogen Charging Group
1
5P-8610
Auxiliary Fitting Group
1
9U-5617
Oil Refill Pump
2
WARNING:
Dry nitrogen is the only gas approved for use in the suspension cylinders. Charging the suspension cylinders with oxygen gas will cause an explosion. This danger will not happen if nitrogen cylinders with standard CGA (Compressed Gas Association, Inc.) Number 580 Connections are used.
When you order nitrogen gas, be sure that the cylinders are equipped with CGA No. 580 Connections. Do not use color codes or other methods of identification to tell the difference between nitrogen cylinders and oxygen cylinders.
Never use an adapter to connect your nitrogen charging group to a valve outlet used on both nitrogen, oxygen or other gas cylinders. Be sure you use dry nitrogen (99.8% purity).
Attach the
175-5507
Nitrogen Charging Group to the quick couplers or to the charging valves at each suspension cylinder.
Note:
To prevent oil flow into the charging hoses, do not open the charging valves at this time.
On the supply tank, adjust the regulated pressure to 4150 kPa (600 psi).
Open the shutoff valves in order to allow nitrogen to flow to the
7S-5106
Chucks. Turn the check valves on the
7S-5106
Chucks clockwise. This opens up charging valves (2). This allows nitrogen to flow to charging valves (2) .
NOTICE
To protect the wiper seals on the front suspension cylinders from damage when the gauge blocks are inserted, make sure the gauge blocks include the chamfer.
Allow nitrogen into the suspension cylinder until gauge block (6) and any required shims can be inserted between the axle and the suspension cylinder.
Note:
If one suspension cylinder has extended to the correct amount before the other suspension cylinder, close the shutoff valve for that suspension cylinder. Continue allowing nitrogen into the other suspension cylinder until the correct extension has been reached.
After the suspension cylinders have extended and after the gauge blocks have been inserted, close both of the shutoff valves. Turn the check valves on the
7S-5106
Chucks counterclockwise. This closes charging valves (2) .
Disconnect the charging hoses at the quick couplers. Turn the check valves on the
7S-5106
Chucks clockwise. This opens charging valves (2) in order to release nitrogen from the suspension cylinders. Continue to purge nitrogen until the suspension cylinders come down to rest on the gauge blocks. Then, turn the check valves on the
7S-5106
Chucks counterclockwise. This closes charging valves (2) .
Connect the charging hoses to the quick couplers. On the supply tank, adjust the regulated pressure to 2400 kPa (350 psi).
Open the shutoff valves. Turn the check valves on the
7S-5106
Chucks clockwise. This opens charging valves (2). Allow nitrogen to flow into both suspension cylinders. Leave the charging valves open for approximately five minutes in order to allow the pressure to equalize. Then, turn the check valves on the
7S-5106
Chucks counterclockwise. This closes charging valves (2). Close the shutoff valves. Turn off the nitrogen pressure at the supply tank.
Remove the
175-5507
Nitrogen Charging Group. Install the valve caps to the charging valves. Torque the valve caps to 2 to 3 N·m (18 to 27 lb in).
Start the engine. To remove the gauge blocks, raise the truck body and turn the steering wheel so that the front wheels move. The suspension cylinders should raise. When the suspension cylinders are not resting on the gauge blocks, remove the gauge blocks.
After the suspension cylinders have been properly charged, measure the exposed chrome length of each suspension cylinder. Record this measurement. Use these recorded dimensions as a reference when you inspect the front suspension cylinders.
This is an alternative to Step 11. Operate the machine for several load cycles after the machine has been properly charged. Some of the exposed chrome length will be clean because of the wiper seals. Measure this length for each suspension cylinder. Record this measurement. Use these recorded dimensions as a reference when you inspect the front suspension cylinder.
The normal height of a charged suspension cylinder will be less than the height of the gauge block.
When the front suspension cylinders are properly charged, the left front suspension cylinder will not show as much of the chrome as the right front suspension cylinder shows. This is due to the weight of the cab.
If you need more information, You can visit:
http://www.cat.com
769D Off-Highway Trucks. Suspension Cylinder (Front) - Purge and Charge
2013-01-02T20:41:00-08:00
Rating:
4.5
Diposkan Oleh:
Unknown
0 comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Entri Populer
777F OFF-HIGHWAY TRUCK: BRAKE SYSTEM
Two separate brake systems are used on the 777F. The two brake systems are the service/retarder brake system and the parking/secondary brake...
777F MAINTENANCE AND WALK AROUND INSPECTION
Before working on or operating the truck, read the Operation and Maintenance Manual thoroughly for information on safety, maintenance and op...
777F Off-Highway Truck Charging Tools for Suspension Cylinder
9U-5617 Oil Refill Pump (1) Shutoff valve for the regulator (2) 7S-5106 Chuck (3) Shutoff valve(4) Charging hoses 175-5507 Nitrogen Charging...
769D Off-Highway Trucks: Suspension Cylinder (Rear)
The rear suspension cylinders are fastened between supports on the rear of the machine frame and to the rear axle housing. The suspension cy...
777F OFF-HIGHWAY TRUCK: POWER TRAIN INTRODUCTION - TORQUE CONVERTER
The 777F Off-highway Truck power train is electronically controlled. The Transmission/Chassis ECM controls the ECPC transmission shifting an...
Labels
1080p
1200
1600
160GB
1917 Model G
2012
2025
250GB
320GB
32GB
360®
500GB
768C TRACTOR 769C TRUCK POWER TRAIN
769D
770G
770G and 772G
770G and 772G Off-Highway Truck (OEM) Hydraulic and Braking System
772G
773E
773E and 775E
773G
775E
775G
777F
777G
785C
789D
789D and 789D XQ Off-Highway Truck Air System and Brakes
793D
793D Off-Highway
793D Off-Highway Truck
793F
795F AC
797B
797B Off-Highway Truck Fan Drive Hydraulic System
797F
80GB
997F
actor
actress
ad
Afterglow
airship
AllStars
Amazon
Ambidextrous
art
Assassin's
AX.1
B4F00014
Band
Base
Basic
Beach
beer
bird
birthday
Black
Black Ops 2
Blue
bmw
bobber
Bonus
Bros.
Brothers
buell
Bulk
Bundle
cafe racer
Call
cars
cat
Catz
CB
Chain
Charge
Charging
Chili
china
City
Classic
Code
Collection
Combo
Console
Controller
craft
Creed
cruiser
dambass
Dance
date
death
Deluxe
design
Digimon
Digital
dirt bike
Download
DPad
drag race
Dualshock
ducati
Duty
Edition
electric
English
Entertainment
evil disney
Exclusive
expensive shit
Expert
Family
Fender
finland
fire
france
Friday
Full
fun
fuzz
Game
Gamecube
games
Gaming
garage
GB
gear
Generic
german
Gigabyte
Glossy
GMM6980
Gold
goons
graphic design
Guitar
Halo
Hardened
Hardware
harley
Headset
Henderson
Hero
Historia
history
Holiday
honda
Hyrule
ijn
india
indian
Instant
Intercooler
isle of man
italy
Japan
joke
junk
Just
Kart
kawasaki
kids
KILO
Kinect
ktm
Land
Laverda
Legend
Legends
Lego
Limited
LIVE
machining
magazine
Mario
Membership
met
michigan
Microsoft
mistery bike
MODEL
models
Month
Mouse
Move
movie
mstery bike
MT4400
music
Nike+
Nintendo
NUKETOWN
Nunchuck
Nunchuk
Nyko
Ocarina
odd ball
Off-Highway Truck
Online
opinion
Original
ornament
Packaging
painting
parts
Peppers
peugeot
phone
photography
pinup
plane
Platinum
Play
Player
PlayStation
Playstation 3
Plus
Points
poland
politics
Portugal
Princess
ProLaser
Ps3
racer
Racing
Rayman
Razer
Remote
Resort
robot
Rock
Roku
Royal Enfield
RZ0100780100R3U1
safety
SBK
scooter
sculpture
Selects
shirt
sick stuff that Buck posts
sidecar
Silver
singer
Skyward
sokol
Sonic
Spirit
Sports
Starter
Station
Stereo
story
strange bike
Stratocaster
Streaming
Super
suzuki
sweden
Sword
System
System/PlayStation
Taipan
technology
Theology
Time
tools
Tour
track
Tracks
Transformed
Transforming
Triforce
trike
Triumph
truck
Turtle
Twilight
uk
uk fun
Uncharted
Undercover
ural
Value
vespa
vintage
Vol.
war
White
Wii
Wii U
Windows
Wired
Wireless
women
wood
World
Xbox
Xbox 360
Xbox Controller
Xbox Live
yamaha
Year
Zelda
ZombiU
Powered by
Blogger
.
0 comments:
Post a Comment